
Est. 2009
Licensed · Bonded · Insured
Commercial Demolition
Every StructureRemoved.Every DeadlineMet. Guaranteed.
Hydraulic jaws and wrecking crews for warehouses, strip-outs, and condemned structures. We leave the soil raked and the schedule intact.
On-Time Completion
Full Permit Compliance
Clean-Site Handover
Completed Projects
The proof is in the cleared ground.
Each project below is a case study in the three guarantees. Click any tile to see the numbers.

Columbus, OH · 2025
Meridian Cold Storage

Indianapolis, IN · 2024
Fairview Retail Park

Detroit, MI · 2024
Lincoln Vocational High

Cleveland, OH · 2025
Northwest Distribution Hub

Cincinnati, OH · 2023
Ashton Terrace Apartments
Pittsburgh, PA · 2023
Central Avenue Strip Mall
The Six-Phase Method
Every phase anchors a guarantee.
From the first survey to the last compaction test — a methodical sequence designed so nothing gets missed and every promise gets kept.
Site Survey
Licensed engineers walk the structure. We map hazmat zones, load-bearing elements, and utility tie-ins before a single permit is filed.
Survey completed within 48 hours of engagement.
Permit Filing
We prepare and submit all municipal, environmental, and state demolition permits. Our in-house compliance team has a 100% first-submission approval record.
Zero revision requests across 340+ permits filed.
Hazmat Abatement
Certified abatement crews remove asbestos, lead paint, PCBs, and refrigerants under full EPA protocol. All materials manifested and disposed at licensed facilities.
EPA-certified abatement. Every manifest on file.
Structural Demolition
Long-reach excavators, hydraulic shears, and high-reach demolition rigs execute the teardown sequence engineered in Phase 1. Dust suppression active throughout.
Schedule adherence: 94% of projects complete early.
Debris Hauling
Concrete, steel, masonry, and timber sorted on-site. Recyclable materials diverted from landfill. Weight-manifested loads tracked from pad to final disposition.
Average 78% material recycling rate per project.
Soil Grading & Handover
Final grading to design elevation. Compaction testing, photos, and a signed clean-site certificate delivered to you before we leave the gate.
Signed certificate. Compaction report. Same-day delivery.
Client Record
Quiet evidence. Loud results.
0+
Projects Completed
Since 2009
0+
Tons Removed
Total lifetime tonnage
0%
On-Time Rate
Across all projects

Marcus Ellison
VP Construction
Hartwell Group
3 days early
vs quoted schedule
Meridian Cold Storage
"Raze cleared 3.8 million pounds of structure in 31 days. They quoted 34. I've been a GC for 22 years — that kind of performance doesn't happen by accident."

Raymond Cho
Senior Project Engineer
Detroit DPW
0 revisions
permit approval record
Lincoln Vocational High
"Our municipal counsel reviewed their permit package and called it the most complete pre-demolition submission they'd ever received. First-time approval, no exceptions."

Diane Kowalski
Development Director
Praxis Capital
$0
over quoted contract value
Fairview Retail Park
"We've used four demolition contractors in the past decade. Raze is the only one that handed us a site cleaner than the contract required — and charged us exactly what they quoted."
Primary CTA
Get Your Site Assessment.
Tell us about your site. We'll respond within one business day with a scope outline, preliminary timeline, and a no-obligation estimate.
Not Ready to Book?
Free Download
The Demolition Planning Checklist
24 questions every owner and GC should answer before engaging a demolition contractor — covering permits, hazmat, utilities, and scheduling.
Licensed & Bonded
All 50 states
78% Recycling Rate
Avg per project
Zero OSHA Incidents
2022–2025 record
100% Permit Rate
First-submission approval