Commercial building mid-demolition with excavator long-reach arm silhouetted against pale overcast sky, dust settling like fog

Est. 2009

Licensed · Bonded · Insured

Commercial Demolition

Every StructureRemoved.Every DeadlineMet. Guaranteed.

Hydraulic jaws and wrecking crews for warehouses, strip-outs, and condemned structures. We leave the soil raked and the schedule intact.

On-Time Completion

Full Permit Compliance

Clean-Site Handover

Warehouse DemolitionRetail ClearanceInstitutional TeardownAsbestos AbatementSite GradingPermit ManagementDebris HaulingStructural StrippingWarehouse DemolitionRetail ClearanceInstitutional TeardownAsbestos AbatementSite GradingPermit ManagementDebris HaulingStructural Stripping

The Six-Phase Method

Every phase anchors a guarantee.

From the first survey to the last compaction test — a methodical sequence designed so nothing gets missed and every promise gets kept.

On-Time Completion
Full Permit Compliance
Clean-Site Handover
01
On-Time Completion

Site Survey

Licensed engineers walk the structure. We map hazmat zones, load-bearing elements, and utility tie-ins before a single permit is filed.

Survey completed within 48 hours of engagement.

02
Full Permit Compliance

Permit Filing

We prepare and submit all municipal, environmental, and state demolition permits. Our in-house compliance team has a 100% first-submission approval record.

Zero revision requests across 340+ permits filed.

03
Full Permit Compliance

Hazmat Abatement

Certified abatement crews remove asbestos, lead paint, PCBs, and refrigerants under full EPA protocol. All materials manifested and disposed at licensed facilities.

EPA-certified abatement. Every manifest on file.

04
On-Time Completion

Structural Demolition

Long-reach excavators, hydraulic shears, and high-reach demolition rigs execute the teardown sequence engineered in Phase 1. Dust suppression active throughout.

Schedule adherence: 94% of projects complete early.

05
Clean-Site Handover

Debris Hauling

Concrete, steel, masonry, and timber sorted on-site. Recyclable materials diverted from landfill. Weight-manifested loads tracked from pad to final disposition.

Average 78% material recycling rate per project.

06
Clean-Site Handover

Soil Grading & Handover

Final grading to design elevation. Compaction testing, photos, and a signed clean-site certificate delivered to you before we leave the gate.

Signed certificate. Compaction report. Same-day delivery.

Client Record

Quiet evidence. Loud results.

0+

Projects Completed

Since 2009

0+

Tons Removed

Total lifetime tonnage

0%

On-Time Rate

Across all projects

Marcus Ellison, VP Construction at Hartwell Group

Marcus Ellison

VP Construction

Hartwell Group

3 days early

vs quoted schedule

Meridian Cold Storage

"Raze cleared 3.8 million pounds of structure in 31 days. They quoted 34. I've been a GC for 22 years — that kind of performance doesn't happen by accident."
Raymond Cho, Senior Project Engineer at Detroit DPW

Raymond Cho

Senior Project Engineer

Detroit DPW

0 revisions

permit approval record

Lincoln Vocational High

"Our municipal counsel reviewed their permit package and called it the most complete pre-demolition submission they'd ever received. First-time approval, no exceptions."
Diane Kowalski, Development Director at Praxis Capital

Diane Kowalski

Development Director

Praxis Capital

$0

over quoted contract value

Fairview Retail Park

"We've used four demolition contractors in the past decade. Raze is the only one that handed us a site cleaner than the contract required — and charged us exactly what they quoted."

Primary CTA

Get Your Site Assessment.

Tell us about your site. We'll respond within one business day with a scope outline, preliminary timeline, and a no-obligation estimate.

Site Assessment Request

Raze Commercial Demolition · Feb 2026

No commitment required. Response within 1 business day.

Not Ready to Book?

Free Download

The Demolition Planning Checklist

24 questions every owner and GC should answer before engaging a demolition contractor — covering permits, hazmat, utilities, and scheduling.

🏛️

Licensed & Bonded

All 50 states

♻️

78% Recycling Rate

Avg per project

🛡️

Zero OSHA Incidents

2022–2025 record

📋

100% Permit Rate

First-submission approval